The complaint is always the same: the tester trips on a long cable, the cable passes at the laboratory, and nobody can reproduce the failure. The cable has not changed. What changed is how fast the voltage was applied.
Current into a capacitor is C times dV/dt. Double the ramp rate and the charging current doubles, regardless of the insulation quality.
Doing the arithmetic
A 100 m three-core cable has roughly 100 pF per metre between conductors, so about 10 nF. At 500 V per second that is 5 µA, which is nothing. At 5 kV per second it is 50 µA, still nothing. The problem appears at the ends of the range: a 1 km run, or a large motor winding at 1 µF, changes the picture completely.
| Load | Capacitance | Current at 500 V/s | Current at 5 kV/s |
| 10 m cable | About 1 nF | 0.5 µA | 5 µA |
| 100 m cable | About 10 nF | 5 µA | 50 µA |
| 1 km cable | About 100 nF | 50 µA | 0.5 mA |
| Small motor winding | About 100 nF | 50 µA | 0.5 mA |
| Large motor, 1 µF | 1 µF | 0.5 mA | 5 mA |
| EMI filter bank, 10 µF | 10 µF | 5 mA | 50 mA |
The last row is where a 5 mA trip setting becomes unusable: the filter alone draws the whole trip current before any insulation is stressed.
Three fixes, in order of preference
- Slow the ramp. Most instruments allow 100 V/s to 500 V/s; halving the rate halves the charging current.
- Use DC for long or capacitive loads. Once charged, the current falls to the insulation leakage, and the trip setting becomes meaningful again.
- Raise the trip current for that sample only. Acceptable in a type test with monitoring, risky in production.
What the tester VA rating means
A 500 VA tester can deliver 500 VA at its maximum output voltage, which for a 5 kV unit is 100 mA. That is the short-circuit capability, not the continuous rating. A capacitive load draws a current spike at the start of each ramp, and a tester with a smaller transformer will collapse its output voltage instead of tripping, which looks like a failed sample and is not.
Watch the voltage trace, not only the current: a droop during the ramp is the signature of an undersized source. Our AC and DC hipot testers log both traces, and the technical notes give the load limits for each model.
Standards referenced: IEC 60243-1 (dielectric strength), IEC 60335-1 clause 13.3, IEC 61010-1 clause 6.8.2 for the tester itself.
A setting table for the three common loads
Before the first test on a new product, measure the capacitance at 1 kHz and do the arithmetic: C times the ramp rate gives the charging current in µA when C is in nanofarads and the rate is in volts per microsecond, or simply I = C × dV/dt. Then choose a ramp that keeps that current under a third of the trip setting.
- Below 10 nF: 500 V/s is fine.
- 10 nF to 200 nF: 200 V/s, or switch to DC.
- Above 200 nF: DC only, or a trip setting above 20 mA.